Tagging and Lockout Responsibilities
Senior Management
Senior management shall:
- Develop a written corporate Tagging and Lockout Procedure.
- Ensure that work-specific or site-specific tagging and lockout procedures conform to requirements of the company's health and safety program.
- Provide general and system-specific tagging and lockout training.
Supervisors
The supervisor shall:
- Provide workers with tags, individual keys, padlocks and scissors.
- Consult with management and/or the owner/client if a secure lockout is not possible.
- Verify that all workers are clear of work area before re-energizing the system.
- Obtain the owner/client's authority to re-energize any system.
Workers
All workers shall:
- Comply with the corporate Tagging and Lockout Procedure and/or the owner/client's tagging and lockout procedure or risk disciplinary action.
Tagging and Lockout Procedure
Isolation Procedure:
Lockout, Tag and Testing Procedure for Electrical & Non-electrical Systems
No. | Instruction | Position Responsible |
1 | General Safety Requirements | |
A | Training/instruction: Ensure all employees have received all required training as required by (company) H&S Program | Field Supervisor |
B | PPE requirements: Ensure all employees have all necessary PPE as required, including individually keyed locks and tags | Field Supervisor |
2 | Safety Planning / Hazard Assessment | |
A |
Identify isolation requirements: The supervisor or a qualified designate (authorized journeyman) must assess the work area to determine what equipment is being worked on, and/or what nearby equipment may pose a hazard and needs to be isolated/locked and tagged out of service. This includes reviewing drawings of the entire system to be de-energized/de-activated to determine what must be isolated and confirming these requirements with client. Physical inspection of the system must also be performed: to ensure the isolation points identified are adequate; to verify isolation points; ensure drawings are accurate and; ensure all isolation components are in acceptable condition. |
Field Supervisor / Qualified Designate |
B |
Maintain isolation log/records: A formal isolation log/record must be maintained for all equipment/systems that require multiple isolations (3 or more) This log must identify the equipment/system being isolated, the date of isolation, the date the isolation was removed, the lock number, the name of the person who performed the isolation, contact information (phone number) and the name of the supervisor. |
Field Supervisor / Qualified Designate |
3 | Lockout / Tag | |
All apparatus capable of being electrically, pneumatically, hydraulically, gravity or otherwise activated must be deenergized or de-activated by physically disconnecting, establishing barriers and otherwise rendering the apparatus inoperable. A lock and tag is used for making certain that the equipment is isolated and cannot be energized by clearly identifying that the system has been isolated for the purpose of protecting personal safety and physically securing the isolation. Switches, power sources, controls, valves, interlocks, pneumatics, hydraulics, computer controlled sources, robotics etc. must be appropriately locked and tagged personally by each worker involved in the operation. |
||
A | Lock out: After all isolation points have been identified and the system has been isolated/de-energized by the supervisor (or designate), each worker who may be required to work on the equipment/system must be protected by placing an individually keyed safety lock (as supplied) on the isolation device. The key for the lock must be kept on their person while the lock is in place. | Field Supervisor / Qualified Designate & Employees involved in task |
B |
Tag: Each worker must attach to the lock a durable tag (provided) containing the information required including: name of the tag owner, date the tag was applied, and the system that has been isolated / work activities. A tag used to identify the purpose of the lock and must clearly identify that the system is not to be energized/operated or that any guards, locks, temporary ground cables , chains, tags and other safeguards are not to be removed until work is complete |
Field Supervisor / Qualified Designate & Employees involved in task |
C |
Additional lockout / tag requirements:
|
Field Supervisor / Qualified Designate |
4 | Testing / Verifying The Isolation | |
The system must be adequately tested to ensure it has been isolated. This may include physical verification of the isolation. | ||
A | Testing Operational Systems: Whenever possible all isolation/de-energizations should be performed by first directly observing the operation of the equipment or system to ensure that the isolation is adequate (properly functioning). | Field Supervisor / Qualified Designate & Employees involved in task |
B |
Testing Non-operational Systems: In many instances it is not possible to directly observe or verify the isolation based on the operability of the equipment or system (if it is inoperable because of equipment/system failure or prior isolation such as plant shut down.. In this case additional measures to physically verify isolation must be taken. This may include disconnecting and physically verifying that all leads are disconnected, testing with a potential indicator, taking additional measures to lock out the system by isolating the primary energy source or establishing secondary barriers. |
Field Supervisor / Qualified Designate & Employees involved in task |
C |
Testing Electrical Systems: Electrical equipment must be tested with a CSA certified potential test indicator to ensure that all components are deenergized and de-activated, including interlocking or dependent systems that could feed into the system being isolated. Test voltage phase to phase and phase to ground. Test the “start up” to ensure that the equipment is off. Workers testing electrical systems must:
|
Field Supervisor / Qualified Designate & Employees involved in task |
5 | Authorization To Proceed/ Verification Of Completion | |
Prior to the commencement of work the supervisor or qualified designate must verify the isolation points with all workers involved in the task by reviewing the isolation log/record and ensuring all necessary locks/tags have been supplied and/or applied. Upon completion of the work the supervisor or qualified designate must verify that the isolation has been removed. | Field Supervisor / Qualified Designate | |
6 | Lock / Tag Removal | |
A |
Removal of locks/tags: After the assigned work is completed and the equipment is to be energized, the supervisor or qualified designate must be notified to receive authorization prior to removal of any locks or other lockout devices from equipment or machinery. The supervisor or designate must verify that the work is complete all isolations have been removed and the equipment is free to safely operate prior to removing the lock and tag. |
Field Supervisor / Qualified Designate & Employees involved in task |
B |
Multiple work groups: Where multiple workers may be working on the equipment or system, the supervisor must make all workers aware in advance when (company) will remove its isolation. All work must be stopped while isolation is being removed. Double shifts: Workers leaving the site must remove their locks and the workers coming on shift must immediately replace them with their own locks. |
Field Supervisor / Qualified Designate & Employees involved in task |
7 | Safety Zone | |
Where nearby equipment may pose a hazard however isn’t in the immediate work area and cannot be locked out or otherwise de-energized, a “safety zone” must be established. This zone must provide a warning perimeter or physical barrier preventing accidental contact with nearby equipment or utilities. | Field Supervisor / Qualified Designate | |
8 | Safety Inspections | |
On a daily basis all employees and supervisors must informally verify that the isolation is adequate by checking the locks/tags and testing the isolation. At a minimum, this inspection is performed prior to commencing work each day. Where isolation is applied (company) supervision and management is responsible for formally ensuring that all employees are following the applicable isolation safety requirements. | Management / Field Suupervisor |
Tagging and Lockout Safe Job Procedure
1. Review drawings of the system to be de-energized and de-activated to determine the switches, power sources, controls, interlocks, or other such devices necessary to isolate the system. Confirm with the client/owner where required.
2. All apparatus capable of being electrically energized or dynamically activated must be de-energized or de-activated by locking out, physically disconnecting or otherwise rendering the apparatus inoperable.
3. Test the system with a CSA-certified potential test indicator to ensure that all components are de-energized and de-activated, including interlocking or dependent systems which could feed into the system being isolated, either mechanically or electrically. Potential test indicators should not be used beyond the voltage limits for which they are rated.
4. Observe the following safeguards for locking out and tagging:
a) After the circuit has been de-energized, locked out by the person in charge, workers must be protected by personally placing their own safety lock on the disconnect switch. Each lock must have a separate key and workers must retain the key for this lock while lock is in place.
b) Where several workers or trades are working on the circuit, provision for additional locks must be made using a lockout bar. This arrangement can accommodate any number of locks by placing another lockout bar in the last hole of the previous bar.
c) In accordance with Section 190(6)3. of the current Construction Projects regulation (O. Reg. 213/91), each worker must attach to their lock a durable tag filled out with the following information:
- Reason why the equipment was disconnected
- Name of person responsible for the disconnection and his/her employer
- Date on which the equipment was disconnected.
d) The de-energized electrical system must be discharged by short circuit and phase to ground. A temporary ground cable must be attached to the system and remain in place until work is completed.
5. A record must be kept of the devices opened, locked out or otherwise rendered inoperable so that all these devices can be reactivated once work is complete.
6. Place signs on the system indicating that it is not to be energized or operated and that guards, locks, temporary ground cables, chains, tags, and other safeguards are not to be tampered with or removed until work is complete.
7. Workers testing electrical equipment must:
- Remove all watches, rings, neck chains or other current-conducting jewelry
- Wear electric shock resistant footwear
- Wear safety glasses with side shields.
Note: In-plant procedures specified by the owner or client take precedence over the procedures outlined here, providing there is no contravention of existing codes or statutes.
- Details
- Category: About us
- Hits: 286
Tesla Equipment List
NO | MTE ID | Item | Model | Mfr |
1 | TESLA-E01 | 3PH secondary Injection | FREJA300 | Programma/Megger |
2 | TESLA-E02 | 3PH secondary Injection | FREJA300 | Programma/Megger |
3 | TESLA-E03 | 3PH secondary Injection | FREJA300 | Programma/Megger |
4 | TESLA-E04 | 1PH Seconadry Injection | SEVERKER780 | Programma/Megger |
5 | TESLA-E05 | Universal primary injection | CPC100 | Omicron |
6 | TESLA-E06 | CT-Analyzer | CT-Analyzer | Omicron |
7 | TESLA-E07 | HV Tester | 6CP50/10-3 | PHENIX |
8 | TESLA-E08 | Breaker Analyzer | Egil | Programma/Megger |
9 | TESLA-E09 | Microommeter | MOM600 | Programma/Megger |
10 | TESLA-E10 | Power Supply Unit | B10E | Megger |
11 | TESLA-E11 | 5KV Insulation Tester | MIT510/2 | Megger |
12 | TESLA-E12 | 2KV Voltage Injection | Magnus | Programma/Megger |
13 | TESLA-E13 | Digital Mutlimeter | Fluke87 | Fluke |
14 | TESLA-E14 | Digital Mutlimeter | Fluke87 | Fluke |
15 | TESLA-E15 | Digital Mutlimeter | Fluke87 | Fluke |
16 | TESLA-E16 | Digital Mutlimeter | Fluke87 | Fluke |
17 | TESLA-E17 | Digital Mutlimeter | Fluke87 | Fluke |
18 | TESLA-E18 | Digital Mutlimeter | Fluke87 | Fluke |
19 | TESLA-E19 | Digital Mutlimeter | Fluke87 | Fluke |
20 | TESLA-E20 | Digital Mutlimeter | Fluke87 | Fluke |
21 | TESLA-E21 | Digital Mutlimeter | Fluke87 | Fluke |
22 | TESLA-E22 | Digital Mutlimeter | Fluke87 | Fluke |
23 | TESLA-E23 | Digital Mutlimeter | Fluke88 | Fluke |
24 | TESLA-E24 | Digital Mutlimeter | Fluke89 | Fluke |
25 | TESLA-E25 | Digital Mutlimeter | Fluke90 | Fluke |
26 | TESLA-E26 | Digital Mutlimeter | Fluke91 | Fluke |
27 | TESLA-E27 | Current Clampmeter | Fluke92 | Fluke |
- Details
- Category: About us
- Hits: 306
Quality & HSE
TESLA Quality & HSE Vision
In addition to fulfilling our compliance obligations to legal and other requirements, Tesla is committed to putting Quality & HSE at all our activities, including design, operations and services.
Tesla Work Regulations
Tesla organization
TESLA QUALITY
CONTROL AND CALIBRATION OF INSPECTION MEASURMENT & TEST EQUIPMENT
TESLA FOR ELECTRICAL SERVICES & Contracting CO. LTD.
1- PURPOSE
This procedure is to establish a uniform and controlled method for the calibration of measuring and test equipment and assigns responsibility for its implementation.
2- SCOPE
All company and personal measuring and checking equipment used in the production of moulds, press tools, gauges and scientific equipment shall be calibrated in accordance with this procedure.
3- DEFINIATION
None.
4- REFRENCES
None.
5- ASSOIATED DOCMENTS
None.
6- PROCDURES
6.1 The Quality Assurance Manager, or responsible person designated by him shall be responsible for the calibration of all measuring and test equipment, including Toolmakers own personal equipment used in production.
6.2 The Quality Assurance Manager shall be responsible for ensuring that all measuring and test equipment is maintained in calibration by conducting periodic audits of the calibration system.
6.3 Equipment shall be calibrated at periodic intervals established on a basis of
a) Stability
b) Purpose
c) Usage
Intervals shall be set so the calibration occurs prior to any probable change in accuracy, depending on the previous calibration result.
6.4 Items of test equipment which:
a) Are outside their designated calibration period
b) Have failed in operation
c) Are suspect or known to be outside designated limits
d) Show evidence of physical damage which may affect their use,
shall be immediately removed from use or be conspicuously identified to prevent their use by attaching a red reject label.
6.4.1 When inspection, measuring and test equipment is found to be out of calibration any previous inspection and test reports since the last acceptable calibration, will be assessed for their validity and recorded in the calibration register.
6.5 All measuring and test equipment, both company and personal, used in production or inspection shall be kept in calibration and records of all calibrations shall be kept and shall be traceable to each individual piece of equipment through the use of a unique serial number or mark.
6.6 Records of calibration and re-calibration of all measuring equipment shall be fully documented on the Calibration Record Card and the Calibration Register. The Quality Manager shall maintain the records up to date and retained on file.
6.7 Certificates, Reports, shall support all measurement standards used for calibration or Data Sheets attesting to the date, accuracy and conditions under which the results were obtained. All Certificates, etc. shall be retained for the life of the equipment.
6.8 The calibration status, where possible, shall be clearly displayed on each piece of equipment or its storage box using a calibration label. Where this is not possible the user shall refer to the relevant calibration record. No piece of equipment shall be used after the expiry of its calibration date
6.8.1 No equipment used for final sizing or checking is to be used unless it display's, either on the equipment or the storage box a valid calibration label.
6.9 All new measuring equipment purchased or manufactured in house shall be passed to the Quality Manager for calibration, identification and production of a record card. Equipment shall not be used until this procedure has been completed.
6.10 The Quality Assurance Manager shall ensure that all personnel using equipment, or performing calibrations, are adequately trained and understand the relevant instructions and procedures.
6.11 All equipment shall be handled and stored in a manner that shall prevent damage or adverse effects on the equipment measuring capability.
7- REVIEW PROCEDURES
7.1 Any equipment that fails to stay in calibration for what is considered a practical period of time for that piece of equipment shall be withdrawn from use and a request for repair or replacement shall be put before the Managing Director.
7.2 Any improved method of inspection involving the purchase of new inspection equipment or any new equipment identified for a new contract shall be discussed at the next Quality Review Committee meeting
- Details
- Category: About us
- Hits: 647
We are pleased to enclose herewith our Company profile as ready reference for your kind perusal.
Tesla serves the high voltage energy sector by providing
TESLA Service team:
Electrical testing and commissioning services for protection relays ,transformers and switchgears. With wide experience of installation , Testing and Commissioning inside Saudi Arabia and they have an extensive experience with multinational brands and companies such as:
- SIEMENS
- AREVA
- ABB
- SEL
- GE
TESLA Protection Engineering team:
Secondary protection engineering team with wide range of experience in protection design and calculation according to National Grid standard as well IEEE &IEC Standard
TESLA CABLE JOINT team:
TESLA specializes in (Tihan) HV Cables Up to 145KV Joint installation& termination, we have a professional and experienced Certified Cable Joint team and have a complete set of tools up to 145KV
- Details
- Category: About us
- Hits: 411
- Details
- Category: About us
- Hits: 542
President Message
At TESLA, we embrace flexibility by accommodating our clients’ specific needs through our collaborative approach and personal working style. You can rely on TESLA to seek the best solution for each Service. The knowledge we have to meet your specific requirements is furthered with a high level of resourcefulness and perseverance that is found naturally in the way we work.
Earning our clients’ trust involves teamwork. We work closely with our clients to meet their service needs. Because we are a team, Building Trust, One Client at a Time.
In terms of working with TESLA process can be describe briefly in three simple words: Flexible, reliable, and knowledgeable.
The basic fact of our business is simple: we don’t succeed unless our clients succeed.
Vice President message
At TESLA, we believe that the growth that counts doesn’t always include the bottom line. Our employees are provided opportunities to grow, personally and professionally. With those opportunities, we empower the person, the team, and, ultimately, the company. When that happens, TESLA vision becomes a reality.
A Higher Standard for the Bottom Line
We embrace flexibility by accommodating our clients’ specific needs through our collaborative approach and personal working style. You can rely on TESLA to seek the best solution for each Service. The knowledge we have to meet your specific requirements is furthered with a high level of resourcefulness and perseverance that is found naturally in the way we work.
In terms of working with TESLA process can be describe briefly in three simple words: Flexible, reliable, and knowledgeable.
The basic fact of our business is simple: we don’t succeed unless our clients succeed.
We don’t succeed unless our clients succeed
of the best establishments ever.